F4.2.9 Provide PT Operator Interface for PT Service Plans

Header Image
Project:
F4.2.9 Provide PT Operator Interface for PT Service Plans : Public <<FRAME_Low_Level_Function>> FRAME_Low_Level_Function
Created: 24.10.2019 12:44:32
Modified: 08.09.2021 11:24:40
Project:
Advanced:
This Function shall be capable of providing the following facilities:<br/><br/>(1) A HMI through which the PT Operator can manage the creation of new PT service plans and fare schemes.<br/>(2) This HMI shall enable the preparation of new PT Service Plans and/or new fare schemes to be initiated and managed by the PT Operator.<br/>(3) It shall be possible for the same HMI to be used to output the contents of the new PT Service Plans and fare schemes, as well as to load and amend data in the store of PT Route Static Data and output the data that the store contains.<br/>
  • Associations To
  • Associations From
  • Requirements
  • Advanced
Element Source Role Target Role
«FRAME_Low_Level_Data_Flow» mpto_request_current_static_data
FRAME_Low_Level_Data_Flow «IN»
Name:  
 
Name:  
 
Details:
 
«FRAME_Functional_Area» F4. Manage Public Transport Operations
FRAME_Functional_Area «componentof»
Name:  
 
Name:  
 
Details:
 
«FRAME_Low_Level_Data_Flow» mpto_fare_scheme_planning_strategies
FRAME_Low_Level_Data_Flow «IN»
Name:  
 
Name:  
 
Details:
 
«FRAME_Low_Level_Data_Flow» to.pto-requested_route_static_data
FRAME_Low_Level_Data_Flow «IN»
Name:  
 
Name:  
 
Details:
 
«FRAME_Low_Level_Data_Flow» mpto_service_planning_strategies
FRAME_Low_Level_Data_Flow «IN»
Name:  
 
Name:  
 
Details:
 
«FRAME_Low_Level_Data_Flow» to.pto-revised_services
FRAME_Low_Level_Data_Flow «IN»
Name:  
 
Name:  
 
Details:
 
«FRAME_High_Level_Function» F4.2 Plan PT Service
FRAME_High_Level_Function «componentof»
Name:  
 
Name:  
 
Details:
 
«FRAME_Low_Level_Data_Flow» mpto_route_static_data_updates
FRAME_Low_Level_Data_Flow «IN»
Name:  
 
Name:  
 
Details:
 
«FRAME_Low_Level_Data_Flow» to.pto-revised_fare_schemes
FRAME_Low_Level_Data_Flow «IN»
Name:  
 
Name:  
 
Details:
 
Element Source Role Target Role
«FRAME_Low_Level_Data_Flow» mpto_revised_fare_schemes_for_operators
FRAME_Low_Level_Data_Flow «OUT»
Name:  
 
Name:  
 
Details:
 
«FRAME_Low_Level_Data_Flow» fo.pto-planning_strategies
FRAME_Low_Level_Data_Flow «OUT»
Name:  
 
Name:  
 
Details:
 
«FRAME_Low_Level_Data_Flow» fo.pto-requests_and_updates
FRAME_Low_Level_Data_Flow «OUT»
Name:  
 
Name:  
 
Details:
 
«FRAME_User_Need» 10.1.0.3
FRAME_User_Need «Servedby»
Name:  
 
Name:  
 
Details:
 
«FRAME_Low_Level_Data_Flow» fo.pto-fare_strategies
FRAME_Low_Level_Data_Flow «OUT»
Name:  
 
Name:  
 
Details:
 
«FRAME_Low_Level_Data_Flow» fo.pto-route_static_data_update
FRAME_Low_Level_Data_Flow «OUT»
Name:  
 
Name:  
 
Details:
 
«FRAME_Low_Level_Data_Flow» mpto_route_static_data_for_reports
FRAME_Low_Level_Data_Flow «OUT»
Name:  
 
Name:  
 
Details:
 
«FRAME_Low_Level_Data_Flow» fo.pto-request_route_static_data
FRAME_Low_Level_Data_Flow «OUT»
Name:  
 
Name:  
 
Details:
 
«FRAME_Low_Level_Data_Flow» mpto_revised_services_and_schedules
FRAME_Low_Level_Data_Flow «OUT»
Name:  
 
Name:  
 
Details:
 
Requirement Type Status Difficulty Priority Stability
Functional Functional Proposed Medium Medium Moderate
Details:
(a) continuously monitor for the receipt of any of the input data flows from the PT Operator;<br/>(b) when any of the data flows in (a) are received, process their contents;<br/>(c) if the result of (b) is that updates to the static data have been provided, send the data to the Manage PT Route Data Store function using the route static data updates data flow;<br/>(d) if the result of (b) is that service planning strategies have been provided send them to the Plan New Service Schedule function using the service planning strategies data flow;<br/>(e) if the result of (b) is that fare planning strategies have been provided send them to the Plan Fare Schemes function using the fare scheme planning strategies data flow;<br/>(f) if either of the revised services and schedules or revised fare schemes for operator data flows is received then output their contents to the PT Operator using the appropriate data flow;<br/>(g) if the result of (b) is that the PT Operator has made a request for the current static data, then send the request to the Manage PT Route Data Store function using the data flow containing the request current static data;<br/>(h) when the route static data for reports data flow is received in response to (g) output its contents to the PT Operator using the appropriate data flow.<br/>
Property Value
isReadOnly: false
isFinalSpecialization: 0