F3.3.11 Simulate Demand Management Strategy

Header Image
Project:
F3.3.11 Simulate Demand Management Strategy : Public <<FRAME_Low_Level_Function>> FRAME_Low_Level_Function
Created: 24.10.2019 12:44:29
Modified: 08.09.2021 11:24:32
Project:
Advanced:
This Function shall be capable of providing the following facilities:<br/><br/>(1) The ability to simulate the imposition of a demand management strategy.<br/>(2) The ability to carry out its simulations at the request of the Transport Planner who must specify the existing strategy that is to be simulated.<br/>(3) The ability to send the results of the simulation to the functionality providing the HMI for the Transport Planner.<br/>
  • Associations To
  • Associations From
  • Requirements
  • Advanced
Element Source Role Target Role
«FRAME_Low_Level_Data_Flow» mt_request_data_&_strategies_for_simulation
FRAME_Low_Level_Data_Flow «IN»
Name:  
 
Name:  
 
Details:
 
«FRAME_Low_Level_Data_Flow» mt_demand_strategy_simulation_results
FRAME_Low_Level_Data_Flow «IN»
Name:  
 
Name:  
 
Details:
 
«FRAME_High_Level_Function» F3.3 Manage Demand
FRAME_High_Level_Function «componentof»
Name:  
 
Name:  
 
Details:
 
Element Source Role Target Role
«FRAME_Low_Level_Data_Flow» mt_current_demand_strategy_for_simulation
FRAME_Low_Level_Data_Flow «OUT»
Name:  
 
Name:  
 
Details:
 
«FRAME_User_Need» 2.1.2.4
FRAME_User_Need «Servedby»
Name:  
 
Name:  
 
Details:
 
«FRAME_Low_Level_Data_Flow» mt_run_demand_strategy_simulation
FRAME_Low_Level_Data_Flow «OUT»
Name:  
 
Name:  
 
Details:
 
«FRAME_User_Need» 7.3.0.4
FRAME_User_Need «Servedby»
Name:  
 
Name:  
 
Details:
 
«FRAME_User_Need» 7.3.0.5
FRAME_User_Need «Servedby»
Name:  
 
Name:  
 
Details:
 
«FRAME_Low_Level_Data_Flow» mt_network_use_data_for_simulation
FRAME_Low_Level_Data_Flow «OUT»
Name:  
 
Name:  
 
Details:
 
«FRAME_User_Need» 2.1.2.5
FRAME_User_Need «Servedby»
Name:  
 
Name:  
 
Details:
 
«FRAME_Low_Level_Data_Flow» mt_new_demand_strategy_for_simulation
FRAME_Low_Level_Data_Flow «OUT»
Name:  
 
Name:  
 
Details:
 
Requirement Type Status Difficulty Priority Stability
Functional Functional Proposed Medium Medium Moderate
Details:
(a) when the run demand strategy simulation data flow is received, send the request for data and strategies for simulation data flow to the Manage Demand Management Data Store function;<br/>(b) when the data and strategy for simulation data flows have been received, run the simulation to show what is expected to happen when the strategy is implemented<br/>(c) when (b) is completed, send the results in the demand strategy simulation results data flow to the Provide Transport Planner Interface function;<br/>(d) if the new demand strategy for simulation data flow is received, send the request for data for simulation data flow to the Manage Demand Management Data Store function;<br/>(e) repeat (b) and (c).<br/>
Property Value
isReadOnly: false
isFinalSpecialization: 0