F3.1.1.5.2 Provide Planned Urban Traffic Management

Header Image
Project:
F3.1.1.5.2 Provide Planned Urban Traffic Management : Public <<FRAME_Low_Level_Function>> FRAME_Low_Level_Function
Created: 24.10.2019 12:44:25
Modified: 08.09.2021 11:24:28
Project:
Advanced:
This Function shall be capable of providing the following facilities:<br/><br/>(1) The ability to enable urban traffic management strategies to be implemented automatically by a timed sequence.<br/>(2) The ability for the sequence mechanism to permit the implementation to be by any combination of time of day, day of week, day of month, or day of year.<br/>(3) The ability for new sequences to be received from the functionality that provides the Road Network Operator interface.<br/>(4) The ability to respond to requests received from the functionality that provides the Road Network Operator interface with details of the sequences that are currently available for use.<br/>(5) The ability to send requests for the implementation of traffic management strategies to the urban traffic management functionality.<br/>
  • Associations To
  • Associations From
  • Requirements
  • Advanced
Element Source Role Target Role
«FRAME_Low_Level_Data_Flow» mt_planned_urban_traffic_management_request
FRAME_Low_Level_Data_Flow «IN»
Name:  
 
Name:  
 
Details:
 
«FRAME_Low_Level_Data_Flow» mt_planned_urban_data_read
FRAME_Low_Level_Data_Flow «IN»
Name:  
 
Name:  
 
Details:
 
«FRAME_High_Level_Function» F3.1.1.5 Provide Urban Traffic Management Facilities
FRAME_High_Level_Function «Componentof»
Name:  
 
Name:  
 
Details:
 
Element Source Role Target Role
«FRAME_User_Need» 7.1.0.10
FRAME_User_Need «Servedby»
Name:  
 
Name:  
 
Details:
 
«FRAME_User_Need» 7.1.3.7
FRAME_User_Need «Servedby»
Name:  
 
Name:  
 
Details:
 
«FRAME_Low_Level_Data_Flow» mt_urban_strategies_for_long-term
FRAME_Low_Level_Data_Flow «OUT»
Name:  
 
Name:  
 
Details:
 
«FRAME_User_Need» 7.1.3.6
FRAME_User_Need «Servedby»
Name:  
 
Name:  
 
Details:
 
«FRAME_Low_Level_Data_Flow» mt_planned_urban_data_update
FRAME_Low_Level_Data_Flow «OUT»
Name:  
 
Name:  
 
Details:
 
Requirement Type Status Difficulty Priority Stability
Functional Functional Proposed High Medium Moderate
Details:
(a) when the first trigger input data flow is received the command that it contains shall be checked;<br/>(b) if the result of (a) is that the current available sequences are to be changed, then this shall be implemented;<br/>(c) completion of (b) shall be confirmed using the first trigger output data flow;<br/>(d) if the result of (a) is that details of the current sequences are to be output, this shall be sent to the urban traffic control Function using the first trigger output data flow;<br/>(e) periodically, the sequences shall be scanned and the next one to be implemented for the current day and time shall be determined;<br/>(f) when the day and time determined in (e) arrives, the control strategy(ies) requested in the sequence shall be sent to the urban traffic control Function using the second trigger output data flow;<br/>(g) when the second trigger input data flow is received the data for the new or revised urban traffic management strategy shall be checked for format and consistency;<br/>(h) if the result of (g) is acceptable, the strategy shall be made available for selection when required;;<br/>(i) if the result of (g) is not acceptable, then details shall be output using the first trigger output data flow;<br/>(j) the actions in (e) and (f) shall take priority over all other actions carried out by this Function.<br/>
Property Value
isReadOnly: false
isFinalSpecialization: 0