|
Project:
|
7.5.2.3 : Public <<FRAME_User_Need>> FRAME_User_Need
The system shall enable a traffic signal controller to receive a request for a green phase from an approaching vehicle; in the event that more than one conflicting request is received at the same time they shall be prioritised (e.g. emergency vehicles before private vehicles), possibly by the TCC operator.<br/><br/><br/>
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||